National

Train 18 Facts- India’s first Engine-less train to soon replace Shatabdi Express

Train 18 Wiki:

India’s first engineless train will prove to be a revolution in Indian Railways. The semi- high-speed train named Train 18 is entirely designed and built in India under the Make in India campaign in a time span of 18 months. Train-18 was rolled out on October 29, 2018, in Chennai. The train was tested for its brakes and crew orientation. The train is manufactured by Integral Coach Factory (ICF)  at a cost of Rs 100 crore. It is built at a 40% less cost than a similar train imported from Europe. The unit cost is expected to come down with subsequent production of units.

image source

After the 3-4 day trial period, the train is supposed to be handed over to Research Design and Standard Organisation (RDSO) for further checks and final speed test. Train 18 Project will mark as a milestone in the success of Make In India Campaign initiated by Prime Minister Narendra Modi.

Train 18 Indian Railways:

Talking about the Train 18 Design, its exterior appearance resembles a bullet train with an aerodynamic narrowing of each end of the train. It has 16 passenger cars that can accommodate a total of 1,128 passengers. The two compartments in the center are first class compartments with a seating of 52 people each. Rest of the compartments has a seating of 78 people each. While the train is entirely built and designed in India, the train’s doors, seats, branking system, and transformers are the only elements imported in the first production, with a plan to domestically produce for the next unit. It has a driver coach at each end of the train allowing the faster turnaround at each end of the line.

image source

It is fully air-conditioned. The interesting feature is that all the seats in the train can be rotated 360 degrees. The train will have diffused lighting, sliding footsteps, automatic doors, and GPS based passenger information system. It is also fitted with CCTV cameras for safety purpose of passengers. Moreover, it will also have Wi-Fi and infotainment facilities.

The train 18 Images are no less than a dream come true towards India’s progress in Infrastructure and Transportation.

Train 18 Route:

The first set of Train 18 will run between New Delhi and Bhopal. It will replace Delhi-Bhopal Shatabdi Express which has been running for 30 years. Train 18 will reduce the travel time on this route by about 15%. The semi-high speed train will run at a speed 160 kilometers per hour (99mph) which is 30kph more than the Shatabdi express. It is planned to be functional by February 2019.

image source

Train 18 India:

Indian Railways is planning the production of another unit of Train 18 in the next year. Production of 4 more units will follow the subsequent year, that is, in 2020. We can assume that by 2021, we will have a total of six Train 18 running on different routes.

image source

Indian Railways and ICF are also collectively planning the development of Train 20. It will be another semi-high speed train that will replace Rajdhani Express.

In a recent interaction held with BJP Booth workers, Prime Minister Narendra Modi spoke about how Shatabdi being the fastest train in India was introduced in 1988 and since then, in last 30 years, there has been no upgradation and innovation in Railways. He promised that by 2020, the semi-high speed train, Train 18, will successfully run across different routes.

Leave a Reply

Your email address will not be published. Required fields are marked *

 

Close